Well it's over 2 weeks and as you would expect we are deep into preparations of Moosetracks for our impending departure. We finally finished the teak toe rails and they look really nice, not much to photograph but nice to look at. We have also had numerous sewing projects including a bike bag for Liz, life raft cover and cockpit enclosure. So here are some pictures....
 |
| Cockpit Enclosure |
 |
| Life Raft Cover |
 |
| Liz's Bike |
 |
| The Bike in bag |
Then of course we needed a bag for the new bike Devin got for retirement from Jabil, we found a really good price online so bought it instead. Here it is...
Then we had lots of projects to complete like; fitting a wind vane, a lightening arrester, a masthead LED tricolor/anchor light, a high water alarm in the bilge and second bilge pump. Then it was time to recommission the water maker... and moving all our stores because we worry about water leaks on electronics. Here is the result.... piles of boxes...
 |
| Lots to organize |
So since we we have worked non-stop for over 2 weeks it's time to take a break. We are heading out to test our gear on Moosetracks over Thanksgiving for 5 days...wooppee!
Happy Thanksgiving to all.